|

Credit earned = (% Credit eligible for a SCM) x (Stormwater Fee) x (% of impervious or pervious area treated)

For example, if a site has a detention pond installed which qualifies the site for a 20% credit toward its Stormwater Utility fees, but only 50% of the impervious area on-site drains to the pond, then the site can only be granted a 10% credit (20%*50%). Furthermore, if the fee paid for the site is $350, then the site receiving a 10% credit will have a fee of $315 throughout the entirety of the property owner’s ownership.

Comments are closed.