Citizens, Cypress, News, News General, Roads, Tourism, Uncategorized|

6.7.18 Bushy Park Boat Landing - Digital CROPPED

MONCKS CORNER, S.C. – (Thursday, April 29, 2021) – Berkeley County will resurface the Cypress Gardens Boat Landing parking lot in two sections to limit the impact on the public. The first section will be paved on Monday, May 3 and the second section will be paved on Tuesday, May 4. Striping for the parking lot is expected to be complete on Wednesday, May 5.  This phased approach will allow the public to use the parking lot through the resurfacing work, although parking spaces will be limited during that time. Overflow parking will be available across the street during the construction. The parking lot resurfacing work will be complete on May 5 with the landing returning to full capacity on Thursday, May 6. Please consider using an alternate landing May 3-5.

The resurfacing of Cypress Gardens Boat Landing parking lot is part of the larger boat landing parking lot expansion (see rendering attached). The expansion will increase the parking spaces to 95 boat parking spaces and 51 vehicle parking spaces, including designated ADA accessible spaces for trailers and passenger vehicles.

The Cypress Gardens Boat Landing parking lot expansion is funded by a 3:1 cost match through the U.S. Fish and Wildlife Sports Fish Restoration Grant.

The County is currently in the permitting process for the expansion which includes involvement of the Army Corps of Engineers, S.C. Department of Health and Environmental Control (SCDHEC), S.C. Department of Natural Resources (SCDNR), and local agencies.

###

-Prepared by the Berkeley County Public Information Office-

Comments are closed.