Skip to content
Careers
FAQ
Elected
Business
Sheriff
Employees
Forms & Documents
Courts
Agendas and Minutes
Rss Feed
Facebook
Twitter
YouTube
Open Search Window
Menu
Departments
A to Z
Events
in & around
Explore
the County
About Us
County Holidays
Financial Reports
Mission and Vision
Municipalities
Office Locations
Ordinances
Infrastructure
Building Berkeley
Economic Development
Keep Berkeley Beautiful
Soil and Water Conservation
Water & Sanitation
Places
Berkeley Airport
Berkeley Animal Center
Berkeley County Library
Cypress Gardens
Health
School District
Visitors
Berkeley Blueways
History
Places
Tourism
I Want To . . .
Interactive
Apply
4% Legal Residence Application
Agriculture Application
County Employment
High Mileage Discount
Homestead Exemption
Register to Vote
Find
Agendas & Minutes
Financial Transactions
Forms & Documents
Inmate Lookup
Landfill and Convenience Centers
My Services LookUp
Real Property Search
Register of Deeds Records
Street Name Search
Tax Estimator
Pay
Child Support/Alimony
Property Tax
Traffic Ticket
Vehicle Property Tax
Water & Sewer Bill
Report
Contact Us
Report a Problem
Request
Building Inspection
Freedom of Information Act
Mosquito Spraying
Search
Communication Tower Application
permitting: Communication Tower Application
TMS Number
*
Property Card Search
Site Address
*
Street Address
Address Line 2
City
ZIP Code
Property Owner:
Owner's Address
Street Address
Address Line 2
City
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
District of Columbia
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Vermont
Virginia
Washington
West Virginia
Wisconsin
Wyoming
Armed Forces Americas
Armed Forces Europe
Armed Forces Pacific
State
ZIP Code
Owner’s Phone Number
Email
Preferred Method of Contact:
Phone
E-mail
Other
Other
Contractor
*
SC License #
License Limit:
Contractor’s Mailing Address:
Street Address
Address Line 2
City
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
District of Columbia
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Vermont
Virginia
Washington
West Virginia
Wisconsin
Wyoming
Armed Forces Americas
Armed Forces Europe
Armed Forces Pacific
State
ZIP Code
Phone Number
E-mail Address:
TYPE OF WORK
NEW
ALTER
ADD TO
DEMOLISH
REPAIR
MOVE
Type of Tower
FREESTANDING
GUYED
OTHER
Other
Maximum Height Allowed in Zoning Classification
Height of Proposed Tower
Setbacks
ACTUAL DISTANCE TO A RESIDENTIAL STRUCTURE
MINIMUM SETBACK FROM RESIDENTIAL STRUCTURE REQUIRED
MINIMUM SETBACK REQUIRED
Front
Rear
Right Side
Left Side
ACTUAL SETBACKS
Front
Rear
Right Side
Left Side
DISTANCE OF FALL ZONE
as determined by a SC certified engineer’s letter
**Do you have the signed and sealed letter from the certified engineer indicating that adequate setbacks are provided on all sides to prevent the tower’s fall zone from encroaching onto adjoining properties?
Yes
No
Is The Tower In a FEMA Flood Area?
Yes
No
Is The Tower In the Santee Cooper Dam Break Area?
Yes
No
FEMA lowest floor elevation
Base Floor Elevation plus 1 foot
As determined by the Berkeley County Floods Plain Manager
Are you constructing a NEW tower?
Yes
No
If yes, you are required to file FCC Form 620 to The South Carolina Archives and History under the “Nationwide Programmatic Agreement for the Collocation of Wireless Antennas,” effective March 7, 2005 for Section 106 Review. See website for further information: http://wireless.fcc.gov/siting/npa.html. Once reviewed by the SHPO, you will receive a letter to attach to this application.
Date FCC Form 620 submitted
Date Format: MM slash DD slash YYYY
**Do you have the letter from The South Carolina Archives and History attached?
Yes
No
Are you CO-LOCATING on an existing tower without adding to its height?
Yes
No
If yes, you may need to file FCC Form 621 to The South Carolina Archives and History under the “Nationwide Programmatic Agreement for the Collocation of Wireless Antennas,” effective March 7, 2005 for Section 106 Review. See website: http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-04-222A4.pdf to find out if the co-locating antenna is applicable to these conditions. If applicable, you will receive a letter to attach to this application.
Date FCC Form 621 submitted
Date Format: MM slash DD slash YYYY
**Do you have the letter from The South Carolina Archives and History attached?
Yes
No
Co-Location
Are you locating on existing building or water tank?
Yes
No
Height of existing structure
Height after your equipment is placed
Height of existing tower
Height after your equipment is placed
Owner of existing tower/building/water tank
Owner’s Address
Street Address
Address Line 2
City
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
District of Columbia
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Vermont
Virginia
Washington
West Virginia
Wisconsin
Wyoming
Armed Forces Americas
Armed Forces Europe
Armed Forces Pacific
State
ZIP Code
Phone
**Letter / documentation indicating that co-location on existing towers, buildings, or other tall structures in the vicinity of the proposed tower was attempted by the applicant but found unfeasible; for example, existing tower or building is: a) structurally incapable of supporting applicant’s equipment, b) has insufficient height, c) is not free from interference, or d) not available.
Yes
No
(See Article II.D.6.a. in the Berkeley County Zoning and Development Standards Ordinance # 01-8-35, as amended.)
**Documentation showing the structural capability of the communication tower to accommodate co-location and the willingness of the tower owner to allow co-location on the tower.
Yes
No
Under Article 11.7.D. of the Berkeley County Zoning and Development Standard Ordinance, as amended, the following must be submitted:
One set of the site plan
showing the location of the tower, guy anchors (if any), screening, lighting, buildings and other structures or improvements; parking, driveways, and fences. Adjacent land use should be on the site plan, with precise measurements noted between the proposed tower and any surrounding residential
A copy of the recorded plat on file
One set of the Elevation drawing(s)
shall clearly show the height and design of the tower, and the materials used including color. (See Article: 11.D.10 for Aesthetic Requirements)
All information listed above with ** (as applicable)
Any other documentation of information requested by staff or by the Zoning Board of Adjustment.
Non-refundable administrative fee of $25 must be included with application.
Building Requirements
1.Contract amount or cost of construction signed by both parties.
2.Signed and Sealed Plans by SC License Engineer.
3.Special Inspection Form.
4.Manufacturer Specifications of Materials and Equipment being installed.
5.Electronic Copy of all relevant documents must be added bellow .
*Application is valid 90 days from application date. Failure to submit all required information within the required 90 days, will void your application and a new application and administrative fee will be required*
CONTRACTOR
Cost Of Construction
STATE LICENSE #
Date of Completion
Date Format: MM slash DD slash YYYY
Phone
Name
*
First
Last
Applicant's Email
*
File
Drop files here or
Comments are closed.
X